Manufacturing / Distribution

House of La Rose

Project Information

Year:
2005
Location:
Brecksville, Ohio
Architect:
James N. Gray Co.
Contractor:
James N. Gray Co.
Engineer:
James N. Gray Co.
Owner:
La Rose Distribution

Project Statistics

Sf of Slab on Grade:
280,000
CY of Concrete:
6,500

Project Summary

Amazon

Project Information

Year:
2018
Location:
Euclid, Ohio
Architect:
MacGregor Associates Architects
Contractor:
Whiting-Turner Contracting Company
Engineer:
Browder + Leguizamon & Associates, Inc. and Jordan and Skala Engineers
Owner:
Seefried Development Services, Inc.

Project Statistics

SF of Slab on Grade:
850,900
SF of Structural Slab:
60,000
CY of Concrete:
30,000

Project Summary

The immense size of this project required a very aggressive schedule and demanded an extremely precise floor flatness specification. Extensive planning and execution of that plan by the craftsmen on site led to our ability to place 1600 cubic yard pours (over 200 truckloads and more than an acre of floor space) in a single day. Using cutting edge technology allowed us to meet or exceed the flatness and levelness specifications in all areas. This project has become one of the handful of examples the owner uses on an international basis for a benchmark of concrete finish quality.

View More:
https://www.news-herald.com/news/cuyahoga-county/euclid-amazon-fulfillment-center-progressing-road-improvement-project-to-start/article_65016dc6-053e-11e9-b5c1-876167f30584.html

MGP Distribution Center

Project Information

Location:
Spotsylvania, VA
Architect:
Little Diversified Architectural Consulting
Contractor:
Kinsley Construction
Engineer:
AWB Engineers
Owner:
LIDL

Project Statistics

SF of Slab on Grade:
84,500
SF of Slab on Metal Deck:
16,300
CY of Concrete:
17,200

Project Summary

Excavated Form and Poured 4,500+ LF of footings (including 403 column footings) and building walls.

Poured 1,400+ sf of Loading dock slabs.

Placed and finished 500,000SF of concrete paving around the building for loading Docks and a parking lot.

Placed and finished 7,000+ LF of IWP protection curbs

San J Warehouse

Project Information

Location:
Henrico, VA
Architect:
Livermore Architecture & Engineering
Contractor:
Clayco, Inc.
Engineer:
Livermore Architecture & Engineering
Owner:
San-J International, Inc.

Project Statistics

SF of Slab on Grade:
67,500
SF of Slab on Metal Deck:
15,500
CY of Concrete:
3,500

Project Summary

Excavated Form and Poured 1,600+ LF of footings and building walls.

Radius equipment base, foundation and wall

Pour 65,000+ sf of reinforced slab on grade.

Press Foundation pads.

Tank Mat and pads