Healthcare & Research

Cleveland Clinic Cancer Building

Project Information

Year:
2016
Location:
Cleveland, OH
Architect:
William Rawn Associates
Engineer:
LeMessurier Associates
Owner:
Cleveland Clinic Foundation

Project Statistics

SF of Slab on Deck:
332,500
CY of Concrete:
8,100

University Hospitals Seidman Cancer Center

Project Information

Year:
2009
Location:
Cleveland, OH
Architect:
Cannon Design
Contractor:
Gilbane Co.
Engineer:
Cannon Design
Owner:
University Hospitals

Project Statistics

SF of Slab on Grade:
50,000
SF of Slab on Deck:
305,000
CY of Concrete:
12,500

Project Summary

12,500 cubic yards of concrete. 305,000 square feet of slab on metal deck. 50,000 square feet of slab on grade. 

View More:
https://case.edu/nursing/distance-care/tour-seidman-cancer-center/tour-uh-seidman-cancer-center-cleveland-medical-center

Cleveland Clinic Foundation Miller Family Pavilion and Glickman Tower

Project Information

Year:
2007
Location:
Cleveland Clinic, Cleveland, OH
Architect:
NBBJ Columbus
Contractor:
Whiting Turner
Engineer:
Korda Nemeth Engineering
Owner:
Cleveland Clinic Foundation

Project Statistics

SF of Slab on Grade:
38,000
SF of Slab on Deck:
760,000
SF of Structural Slab:
116,000
CY of Concrete:
21,500

Project Summary

The challenges represented by the massive heart and urological expansion at the Cleveland Clinic included a site restricted on three sides by existing structures, the full array of weather conditions inherent in northeast Ohio and an extremely aggressive schedule. Whiting Turner selected Cleveland Cement as the best choice to overcome these substantial obstacles. Working in conjunction with the construction team, Cleveland Cement was able to install in excess of 750,000 square feet of slab on metal deck, over 100,000 square feet of cast in place structural slabs and several cast in place concrete cores which exceeded 180 feet in height.

View more:
https://issuu.com/nbbj/docs/cleveland_clinic

Sheltering Arms

Project Information

Location:
Richmond, VA
Architect:
Baskerville
Contractor:
Kjellstrom and Lee
Engineer:
DMWPV

Project Statistics

SF of Slab on Grade:
52,800
SF of Slab on Metal Deck:
207,200
CY of Concrete:
8,000

Project Summary

4 story steel frame structure with basement

VCBR Expansion

Project Information

Year:
2018
Location:
Crewe, VA
Architect:
HDR Architecture, Inc.
Contractor:
Balfour Beatty Construction
Engineer:
ADTEK
Owner:
State of Virginia

Project Statistics

SF of Slab on Grade:
124,600
SF of Slab on Metal Deck:
72,800
CY of Concrete:
5,300

Project Summary

Masonry Wall foundations over 5 different buildings 3 have SOMD’s.

Over 200 concrete piers.

125,000 SF of SOG

SOMD –73,000 sf

Loading Dock walls and Slab

VCU Virginia Treatment Center for Children

Project Information

Year:
2016
Location:
Richmond, VA
Architect:
Cannon Design
Contractor:
Balfour Beatty
Engineer:
Cannon Design
Owner:
Commonwealth of Virginia

Project Statistics

SF of Slab on Grade:
97,600
SF of Slab on Metal Deck:
44,600
CY of Concrete:
5,200

Project Summary

Low-rise Structural Steel building of approximately 140,000 s.f. with Slabs on metal deck. Decorative liner-filled, serpentine courtyard walls.

Salem Community Hospital

Project Information

Year:
2012
Location:
Salem, OH
Contractor:
Skanska USA Building Inc.
Owner:
Salem Community Hospital

Project Statistics

SF of Slab on Grade:
26,500
SF of Structural Slab:
60,000
SF of Slab on Metal Deck:
61,000
CY of Concrete:
4,800